Case Studies

Kolhapur, Maharashtra

IIT Bombay


As a Piping Contractor We Provided Complete Piping Engineering Solutions for a 10 Tons Capacity Jaggery Plants Which Included
- Erection of Wood Fired Thermic Fluid Heater.
- Complete Plant Piping Layout for Thermic Fluid Heater Piping.
- S.S. 304 Piping for Process Piping Systems.
- Design and Fabrication of Support Systems for Thermic Fluid Heater During Sustain and Operating Conditions for Stress Flexibility and Sustaining Loads in Piping Systems.
- Piping Material Take Off (MTO), Piping Fabrication, Piping Erection along with its Pneumatic and Hydraulic Testing and Commissioning of Piping Systems.
- Design, Material Take Off (MTO), Fabrication and Erection of Structural Steels Frames for Expansion Tanks.
- Design, Material Take Off (MTO), Fabrication and Erection of Guy Rope Supported M.S. Chimney for Thermic Fluid Heater as per IS Standards along with Cross Connection from Boilers to Main Chimney as per Required Angle of Ducting for Proper Draft of Flue Gases.

Delhi, Vadodara, Hyderabad, Nepal

Megawatt Solutions Pvt. Ltd.


As a Utility Piping Contractor We Provided Complete Piping Turnkey Project Solutions to Megawatt Solutions Pvt. Ltd. For Their Four Plants for Their Solar Industrial Thermic Fluid Heater Systems Which Included
- Erection of Oil Fired Thermic Fluid Heaters, Thermic Fluid Oil Service Tank.
- Complete Plant Piping Layout for Oil Fired Thermic Fluid Heater Piping Systems.
- Piping layout for Solar Industrial Thermic Fluid Heater Systems.
- Designing and Fabrication of Expansion Loops in Piping Systems for Stress Relieving in High Temperature of Thermic Fluid.
- Designing and Fabrication of Shoe Supports for Stress Relief During Operating Conditions of High Temperature Thermic Fluid Oil.
- Piping Material Take Off (MTO), Piping Fabrication, Piping Erection along with its Pneumatic and Hydraulic Testing and Commissioning of Piping Systems.
- Design, Material Take Off (MTO), Fabrication and Erection of Structural Steel Frame and Platform for Expansion Tanks for Thermic Fluid Heater.
- Design, Material Take Off (MTO), Fabrication and Erection of Guy Roped Supported M.S. Chimney for Thermic Fluid Heaters as per IS Standards along with Cross Connection from Boilers to Main Chimney as per Required Angle of Ducting for Proper Draft of Flue Gases.

Palghar, Maharashtra

Transasia Petrochem Pvt. Ltd.


As Piping Contractor, We Provided Complete Plant Turnkey Project for an Oil Manufacturing Plant Which Included
- Design of 60 Tons of Structural Steel Frames and Platforms for Factory for Supporting of Chemical Vessels, Chemical Reactors for Storage Material.
- Erection of Glass Lined Reactors, Chemical Vessels, Kettles, Chemical Reactors.
- Design of Piping Layout for Process Piping for Glass Lined Reactor Piping, Chemical Vessels Piping, Kettles Piping.
- Design of Piping Layout for Oleum Acid, due to its Corrosive Nature of Oleum Acid Plastic Pipe was used with Proper Support for Plastic Piping.
- Design of Scrubber Piping Layout for Removal of Oleum Gas from Processes.
- Designed and Fabricated an Oil Manifold Distribution Systems for Proper Distribution of Chemicals to Various Vessels for Different Process.
- Piping Material Take Off (MTO), Piping Fabrication, Piping Erection along with its Pneumatic and Hydraulic Testing and Commissioning of Piping Systems.
- Design, Material Take Off (MTO), Fabrication and Erection of 60 Tons of Heavy Steel Structures Frames and Platforms.
- Design and Fabrication of Proper Support Systems for Utility Piping Systems and Process Piping Systems.
- Design of Cylindrical Storage Tank for Storage of Oil.
- Overhauling of Thermic Fluid Heaters and making it in Working Condition of Use.
- Electrical Panel Wiring for Thermic Fluid Heater with Auto System.

Ambernath, Maharashtra

Kites Bakers Pvt. Ltd.


As a Piping Contractor We Provided Complete Piping Turnkey Project Solutions for a 35 MT Capacity Per Day of a Biscuit Manufacturing Plant and Also for There Two More Plants which are C.M. Unit of Parle Biscuits Private Limited Which Included
- S.S. 304 Chimney for Biscuit Oven Machine for Force Draft (FD Fan).
- M.S. Chimney for Diesel Operated DG Generators.
- As a Utility Piping Contractor We Have Designed Utility Piping Layout Systems for Cooling Tower Piping, Chilled Water Piping, R.O. Water Piping, Reciprocating Air Compressor Compressed Air Piping.
- Compressed Air Piping Manifold for Distribution of Air at Various Areas of Plants with Proper Air Flow.
- Manifold Piping Distribution Systems where Alternately Cooling Water and Chilled Water May be used in a continuous Mixture as per Process Requirements of continuous Mixtures.
- Ring Man Systems with Filtration of Furnace Oil Systems.
- As a Process Piping Contractors We Have Designed S.S. 304 Piping for Process Piping Layout Systems as per Food Industry Standards for Syrup Reactor Piping, Syrup Service Tank Piping, Silo Tank Piping, RBD Service Tank Piping, Votators Tank Piping, Piping of Pre-Creamer Machine till continuous Mixture for mixing hard dough and soft dough for biscuits, Sugar Pulverise Machine Piping, piping for Multiple Liquid Dosing Systems Load Cell Operated.
- For Proper Flow of Different Fluids, we Designed and Fabricated Process Piping Manifold Systems for Proper Distributions for Silo Tanks, RBD Service Tank, Votators, Syrup Service Tank.
- S.S. 304 Chimney Ducting for Syrup Reactor for Removing Moisture Removing from Syrup Reactor.
- Design and Fabrication of Proper Support Systems for Utility Piping Systems and Process Piping Systems for Sustain Loads During Operation and Sustain Conditions of Piping Systems.
- Piping Material Take Off (MTO), Piping Fabrication, Piping Erection along with its Pneumatic and Hydraulic Testing and Commissioning of Piping Systems.

Nardana, Dhule, Maharashtra

Nandkrishna Chemical Pvt. Ltd.


As a Piping Contractor we had provided a Completed Piping Turnkey Project Solutions to Nandkrishna Chemicals Private Limited for Their Two Chemical Plants Which Included
- Erection of Two Numbers of Oil Fired Thermic Fluid Heater, Oil Fired Steam Boiler.
- As a Utility Piping Contractor We Had Designed We Have Designed Utility Piping Layout Systems for Oil Fired Thermic Fluid Heater Piping, Oil Fired Steam Boiler Piping, Cooling Tower Piping, Chilled Water Piping (Chilling Piping).
- For Proper Distribution of Thermic Fluid to Processes We Have Designed and Fabricated Inlet and Outlet Thermic Fluid Manifold Piping Distribution Systems with a Throttle Valve Connected in Between Two Manifolds for Throttling of Thermic Fluid Oil for Proper Circulation of Thermic Fluid Oil.
- Closed Loop Piping Systems for Thermic Fluid Heater Piping Systems, Cooling Tower Piping Systems and Chilled Water Piping Systems along with a Balance Pipelines in Main Header of Thermic Fluid Piping with a Throttle Valve for Throttling of Fluid for Proper Circulation of Thermic Fluid Oil.
- Steam Boiler Piping Systems with Steam Distribution Systems along with Trap Installation and Condensate Return Piping.
- Fuel Oil Piping for Oil Fired Thermic Fluid Heaters and Oil Fired Steam Boilers Diesel Piping, Furnace Oil Piping with Heat Tracing Systems in Furnace Oil Piping Systems.
- Cooling Water and Chilled Water Manifold Piping Distribution Systems for Proper Flow Distributions to Multiple Condensers.
- As a Process Piping Contractor We Had Designed Process Piping Layout Systems of S.S. 304 Process Piping and S.S. 316 Process Plant Piping Systems for Chemical Reactors Piping, Chemical Vessel Piping, Distillation Column Piping, Reboiler Piping, Heat Exchanger Piping.
- Hydranator Piping Systems with an Inlet and Outlet Manifold Systems for Steam, Cooling Water, Chilled Water Piping Systems which maybe use as per Process Requirements.
- Designing and Fabrication of Expansion Loops, Shoe Supports in Piping Systems for Stress Relieving During High Temperature Operation of Thermic Oil, Steam Boilers. - Designing and Fabrication of Supports for Utility Piping Systems and Process Piping Systems for Sustain Loads During Operation and Sustain Conditions of Piping Systems.
- Piping Material Take Off (MTO), Piping Fabrication, Piping Erection along with its Pneumatic and Hydraulic Testing and Commissioning of Piping Systems.
- Design, Material Take Off (MTO), Fabrication and Erection Guy Roped Supported M.S. Chimney for Thermic Fluid Heaters and M.S. Chimney for Steam Boiler as per IS Standards along with Cross Connection from Boilers to Main Chimney as per Required Angle of Ducting for Proper Draft of Flue Gases.
- Design, Material Take Off (MTO), Fabrication and Erection of Thermic Fluid Oil Storage Tank, Boiler Feed Water Tank, Diesel Tank, Furnace Oil Storage Tank, Furnace Oil Service Tank.
- Design, Material Take Off (MTO), Fabrication and Erection of Structural Steel Frame and Platform for Expansion Tank, Thermic Fluid Oil Storage Tank, Boiler Feed Water Tank, Diesel Service Tank, Furnace Oil Service Tank.
- We Had Also Done Hot Insulations for Steam Boiler Piping, Thermic Fluid Heater Piping, Chemical Reactors, Chemical Vessels, Reboilers, Heat Exchangers, Distillation Column.
- We had also Done Cold Insulation for Chilled Water Piping.
- Provided P&ID Drawings for Whole Utility Piping Systems and Process Piping Systems.
- Providing Annually Maintenance and Overhauling for Oil Fired Pressurized Hot Water Generator and Oil Fired Steam Boilers.
- Attending Breakdown Calls for Oil Fired Pressurized Hot Water Generator and Oil Fired Steam Boilers.

Murbad, Ambernath, Maharashtra

Elite Food Pvt. Ltd.


As a Piping Contractor We Had Provided Piping Turnkey Solutions to Melties Food Groups to their Seven Plants, Elite Foods Industries, TR Products, Fresh Food Industries, Ample Food Industries which is C.M. Unit of Parle Confectionary Which Included
- Erection of Oil Fired Hot Water Generators, Oil Fired Steam Boiler.
- As a Utility Piping Contractor We Have Designed Utility Piping Layout Systems for Oil Fired Pressurized Hot Water Generator Piping, Oil Fired Steam Boiler Piping, Cooling Tower Piping, Chilled Water Piping (Chilling Piping), Rotary Screw Compressor Compressed Air Piping.
- Designed and Fabricated Pressurized Hot Water Manifold System for Multiple Units of Pressurized Hot Water Generators Proper Distribution of Pressurized Hot Water Systems to Various Process Systems.
- Closed Loop Piping of Pressurized Hot Water Generator Piping Systems, Cooling Tower Piping Systems with a Throttle Valve for Throttling of Fluid for Proper Circulation of Pressurized Hot Water.
- Balance Piping for Proper Flow Distribution of Pressurized Hot Water in Process Systems for Proper Heat Transfers.
- Designing and Installation of Solenoid Valve for Air Lock Release in Pressurized Hot Water Piping Systems for Safety Controlling.
- Steam Boiler Piping Systems along with Trap Installations and Condensate Return Piping.
- Steam Manifold Piping Distribution Systems / Steam Distribution Header for Connection of Multiple Steam Boilers and for Proper Distribution of Steam to Various Processes.
- Furnace Oil Piping with Heat Tracing System for Oil Fired Pressurized Hot Water Generator and Oil Fired Steam Boilers.
- Hot Water Manifold Piping Systems for Circulation of Hot Water in Jacketed Piping for Transfer of Moulded Chocolate for Processes.
- Compressed Air Manifold Piping System for Connections of Multiple Rotary Screw Compressors along with Bypass System for Dryer and for Proper Distribution of Air to Various Locations of Whole Plants.
- As a Process Piping Contractor we have Designed S.S 304 Process Piping Systems includes Syrup Holding Tank Piping, continuous Cooker Piping, batch Cooker Piping, Chocolate Holding Tank Piping, Jacketed Kettle Piping, piping for Transfer of Chocolate Fluid to Various Chocolate Making Machines.
- S.S. 304 Jacketed Piping Systems (Heat Tracing of Piping Systems) for Ball Mill machines, Conche Machines with Heat Tracing through Hot Water.
- Manifold Piping Distribution Systems for Transfer of Chocolate Fluid to Various Processes.
- Vacuum Pump Piping Systems for continuous Cookers and Batch Cookers.
- S.S. 304 Chimney Ducting for Continuous Cookers and Batch Cookers for Removing Moistures from Cookers.
- Design and Fabrication of Supports for Utility Piping Systems and Process Piping Systems for Sustaining Loads During Operating and Sustaining Condition of Piping Systems.
- Piping Material Take Off (MTO), Piping Fabrication, Piping Erection along with its Pneumatic and Hydraulic Testing and Commissioning of Piping Systems.
- Design, Material Take Off (MTO), Fabrication and Erection of Guy Roped Supported M.S. Chimney for Pressurized Hot Water, M.S. Chimney for Steam Boilers as per IS Standards along with Cross Connection from Boilers to Main Chimney as per Required Angle of Ducting for Proper Draft of Flue Gases.
- Design, Material Take Off (MTO), Fabrication of Multi Pass Heat Exchanger Coils for S.S. Cold Water Storage Tank to Maintain Temperature of Cool Water for Vacuum Pump for its Better Applications.
- Design, Material Take Off (MTO), Fabrication and Erection of Structural Steel Frame and Platform for Cooling Tower and Raw Water Storage Tank.
- Design, Material Take Off (MTO), Fabrication and Erection of Boiler Feed Water Storage Tanks, Hot Water Service Tanks, Furnace Oil Service Tank, Hot Water Storage Tank, Cold Water Storage for Vacuum Pump, Condensate Recovery Tanks.
- Providing Annually Maintenance and Overhauling for Oil Fired Pressurized Hot Water Generator and Oil Fired Steam Boilers.
- Attending Breakdown Calls for Oil Fired Pressurized Hot Water Generator and Oil Fired Steam Boilers.

Pune, Maharashtra

B. E. Billimoria & Company Ltd.


As a Utility Piping Contractor We Provided Piping Systems for Pressurized Hot Water System for Curing of Cement Blocks for Civil Works which Included
- Erection of Oil Fired Pressurized Hot Water Generator.
- As a Piping Contractor we have Designed Piping Layout for Pressurized Hot Water Generator Piping Distribution Systems.
- We have Designed and Fabricated Inlet and Outlet Pressurized Hot Water Manifold System with Proper Mixture System for Proper Distribution of Pressurized Hot Water to Various Processes.
- Closed Loop Piping of Pressurized Hot Water Generator Piping Systems with a Throttle Valve for Throttling of Fluid for Proper Circulation of Pressurized Hot Water.
- Balance Piping for Proper Flow Distribution of Pressurized Hot Water in Process Systems for Proper Heat Transfers.
- Designing and Installation of Solenoid Valve for Air Lock Release in Pressurized Hot Water Piping Systems for Safety Controlling.
- Fuel Oil Piping i.e. LDO Piping (Light Diesel Oil Piping) for Pressurized Hot Water Generator.
- Design and Fabrication of Shoe Support Systems for Pressurized Hot Water Generator During Sustain and Operating Conditions for Stress Flexibility and Sustaining Loads in Piping Systems.
- Piping Material Take Off (MTO), Piping Fabrication, Piping Erection along with its Pneumatic and Hydraulic Testing and Commissioning of Piping Systems.
- Design, Material Take Off (MTO), Fabrication and Erection of Guy Roped Supported M.S. Chimney for Pressurized Hot Water Generator as per IS Standards along with Cross Connection from Boilers to Main Chimney as per Required Angle of Ducting for Proper Draft of Flue Gases.
- Design, Material Take Off (MTO), Fabrication and Erection of Water Service Tanks, LDO Service Tank, Structural Steel Frames.
- Auto Heating Cut off System in LDO Service Tank.