- Waste Heat Recovery Unit / Waste Heat Recovery Boiler Closed Loop Piping : Designing and Fabrication of Waste Heat Recovery Unit / Waste Heat Recovery Boiler Closed Loop Piping System with Installation of a Throttle Valve at the End of Piping for Throttling of Hot Water for Proper Flow of Hot Water in Piping System.
- Waste Heat Recovery Unit / Waste Heat Recovery Boiler Balance Piping : Designing and Fabrication of Waste Heat Recovery Unit Balance Pipeline / Waste Heat Recovery Boiler Piping for Proper Flow of Hot Water, Proper Heat Transfer to Process Equipment’s and to obtain Proper Required Temperature for Process.
- Waste Heat Recovery Unit Circulation Pump Piping : Fabrication of Frame for Circulation Pump, Designing of Hot Water Circulation Pump Piping Layout while Considering Important Aspects for Pump Piping to Avoid Pump Cavitation and Better Fluid Flow, Designing and Fabrication of Circulation Pump Suction Piping, Designing and Fabrication of Circulation Pump Discharge Pipeline, Designing of Piping Layout for Multiple Circulation Pump Connections, Installation of Strainers, Throttle Valves, Non Return Valves (NRV) with Proper Selection of their Materials and Grade.
- Waste Heat Recovery Unit Manifold Piping Systems / Waste Heat Recovery Boiler Manifold Piping Systems / Waste Heat Recovery Unit Distribution Header / Waste Heat Recovery Boiler Distribution Header : Designing and Fabrication of Waste Heat Recovery Unit Manifold Piping Systems / Waste Heat Recovery Boiler Manifold Piping Systems / Waste Heat Recovery Unit Distribution Header / Waste Heat Recovery Boiler Distribution Header for Multiple Connections of Waste Heat Recovery Units, Distribution of Hot Water to Various Locations of Plant for Proper Flow and Even Distribution of Hot Water with Providing Cost Saving for Clients.
- Waste Heat Recovery Unit Piping Connections / Waste Heat Recovery Boiler Piping Connections : Designing and Fabrication of Inlet and Outlet Waste Heat Recovery Unit / Waste Heat Recovery Boiler Piping Connections Layout for Process Equipment’s with Installations of Throttling Valves.
- Control Station Piping for Waste Heat Recovery Unit / Waste Heat Recovery Boiler : Many Application Requires Automatic Control of Flow of Hot Water and Temperature Control for Processes. As per Applications and Customer Requirements We Design and Fabricate Control Station Piping for Waste Heat Recovery Unit with Bypass Piping System, Selection and Installation of Control Valves Electrically, Pneumatically Operated, Digital Temperature Controller and Industrial Sensors.
When Controlling Fine Tuning is Required for Control of Flow and Temperature, We Design the Control Station Piping System by use of Proportionate Switch for operating of Valve in Percentage Wise for Opening and Closing of Valves for Fine Control of Flow and Temperature for Processes I.e. Less Variation in Temperature.
- Induced Draft Ducting : Designing and Fabrication of Ducting for Induced Draft from Furnace Chimney to Waste Heat Recovery Unit for Creating a Draft in Waster Heat Recovery Unit to Increase the Heat Transfer Efficiency in Waste Recovery Unit.
- Water Generator Charging Piping : Designing and Fabrication of Water Charging Piping for Waste Heat Recovery Unit / Waste Heat Recovery Boiler and Charging of Water During Initial Stage for Filling of Water in Piping Systems and During Running Systems for Low Flow, Low Pressure, low Level of Hot Water to avoid Damage to Water Charging Piping for Waste Heat Recovery Unit / Waste Heat Recovery Boiler and Piping Systems of Whole plant, Installation of Strainers and Throttling Valve.
- Air Lock Removing System : Designing of a System for Removing Air Lock in Piping Systems with Design and Fabrication of a Cylinder of Calculated Diameter and Length with Installation of Solenoid Valve, Low Level Switch for Air Lock Release in Piping Systems for Safety of Piping Systems and Waste Heat Recovery Unit.
- Air Preheater : Design and Fabrication of Ducting for Air Preheaters to Various Locations of Plants.