  • ❖ Hot Water Generator Piping Systems doesn’t come under Purview of IBR (Indian Boiler Act).

❖ Hot Water Generator Piping Layout Includes :
- Hot Water Generator Distribution System : Designing of Piping Layout for Hot Water Generator Distribution System for Various Locations of Plant with Proper Flow and Maintaining Proper Pressure of Water, Fabrication of Piping for Hot Water Generator Distribution System.

- Hot Water Generator Closed Loop Piping : Designing and Fabrication of Hot Water Generator Closed Loop Piping System with Installation of a Throttle Valve at the End of Piping for Throttling of Hot Water Generator for Proper Flow of Hot Water Generator in Piping System.

- Hot Water Generator Balance Piping : Designing and Fabrication of Hot Water Generator Balance Pipeline for Proper Flow of Pressurized Hot Water, Proper Heat Transfer to Process Equipment’s and to obtain Proper Required Temperature for Process.

- Hot Water Generator Circulation Pump Piping : Fabrication of Frame for Circulation Pump, Designing of Hot Water Generator Circulation Pump Piping Layout while Considering Important Aspects for Pump Piping to Avoid Pump Cavitation and Better Fluid Flow, Designing and Fabrication of Circulation Pump Suction Piping, Designing and Fabrication of Circulation Pump Discharge Pipeline, Designing of Piping Layout for Multiple Circulation Pump Connections, Installation of Strainers, Throttle Valves, Non Return Valves (NRV) with Proper Selection of their Materials and Grade.

- Hot Water Generator Manifold Piping Systems / Hot Water Generator Distribution Header : Designing and Fabrication of Hot Water Generator Manifold Piping Systems for Multiple Hot Water Generator Connections, Distribution of Hot Water Generator to Various Locations of Plant for Proper Flow and Even Distribution of Hot Water Generator with Cost Saving for Clients.

- Hot Water Generator Piping Connections : Designing and Fabrication of Inlet and Outlet Hot Water Generator Connections Piping Layout for Process Equipment’s with Installations of Throttling Valves.

- Control Station Piping for Hot Water Generator : Many Application Requires Automatic Control of Flow of Hot Water Generator and Temperature Control for Processes. As per Applications and Customer Requirements We Design and Fabricate Control Station Piping for Hot Water Generator with Bypass Piping System, Selection and Installation of Control Valves Electrically, Pneumatically Operated, Digital Temperature Controller and Industrial Sensors.
When Controlling Fine Tuning is Required for Control of Flow and Temperature, We Design the Control Station Piping System by use of Proportionate Switch for operating of Valve in Percentage Wise for Opening and Closing of Valves for Fine Control of Flow and Temperature for Processes I.e. Less Variation in Temperature.

- Water Generator Charging Piping : Designing and Fabrication of Water Charging Piping for Top of Water in Piping Systems of Hot Water Generator and During Operating Conditions of Piping Systems for Low Flow, Low Pressure, Low Level of Hot Water Generator to avoid Damage to Pressurized Hot Generator and Piping Systems of Whole plant, Installation of Strainers and Throttling Valve.

- Air Lock Removing System : Designing of a System for Removing Air Lock in Piping Systems with Design and Fabrication of a Cylinder of Calculated Diameter and Length with Installation of Solenoid Valve, Low Level Switch for Air Lock Release in Piping Systems for Safety of Piping Systems and Hot Water Generator.

  • ❖ Calculation of Pipe Sizing Based on Velocity and Pressure Drop and Proper Flow.
  • ❖ Calculation of Pipe Wall Thickness as per ASME Standards.
  • ❖ Selection of Manifold Pipe Size for Hot Water Generator.
  • ❖ Selection of Piping Material and its Grades for Pipe, Fittings, Valves as per ASME/ Standards.
  • ❖ Material used for Pipe, Fittings, Valves for Fabrication of Hot Water Generator Piping are of Standard Companies.
  • ❖ Design and Fabrication of Rest Supports for Hot Water Generator Piping Systems to Sustain Dead Loads of Pipe, Fittings, Valves, Weight of Water with Distance Between the Two Supports Are Selected based on Piping Engineering Standards.
  • ❖ Design and Fabrication of Shoe Supports for Free Movement of Pipe during Its Operating Conditions at High Temperature to provide Flexibility to Pipe, Avoid Stresses in Piping Systems.
  • ❖ Wherever Required Expansion Loops Are Designed and Fabricated for High Temperature of Pressurized Hot Water for Providing Flexibility in Piping and to Sustain the Thermal Loads developed due to Stresses developed in Piping.
  • ❖ Piping Material Take off (MTO)/Bill of Material (BOM).
  • ❖ Fabrication of Hot Water Generator Piping is Carried out as per General Engineering Standards and Practices.
  • ❖ Erection of Hot Water Generator Pipelines.
  • ❖ Hydraulic and Pneumatic Testing of Hot Water Generator Piping for Leak Test in Hot Water Generator Pipeline, Checking of Welding Leakages in Piping Weld Joints, Checking of Leakages in Flange Joints and Checking of Leakages in Threaded Connection.
  • ❖ Commissioning of Hot Water Generator Piping.
  • ❖ Hot Insulations for Hot Water Generator Piping with Proper Thickness of Insulation for avoiding Heat Loss.