• Spectra B-503/504, Palava

Cooling Tower Piping

Cooling Tower Piping Contractors

Cooling Tower Piping

❖ Cooling Tower Piping Layout Includes :
- Cooling Tower Water Distribution System : Designing of Cooling Tower Piping Layout for Cooling Tower Water Distribution Systems for Whole Plant to Various Locations of Plant with Even flow of Cooling Water and Its Proper Distribution, Fabrication of Piping for Cooling Tower Water Distribution Systems.

- Closed Loop Cooling Tower Piping : Designing and Fabrication of Closed Loop Cooling Tower Piping System with Installation of a Throttle Valve at the End of Piping for Throttling of Cooling water for Proper Flow of Cooling water in Piping System.

- Cooling Tower Circulation Pump Piping : Fabrication of Frame for Circulation Pump, Designing of Cooling water Circulation Pump Piping Layout while Considering Important Aspects for Pump Piping to Avoid Pump Cavitation and Better Fluid Flow, Designing and Fabrication of Circulation Pump Suction Piping, Designing and Fabrication of Circulation Pump Discharge Pipeline, Designing of Piping Layout for Multiple Circulation Pump Connections, Installation of Strainers, Throttle Valves, Non Return Valves (NRV) with Proper Selection of their Materials and Grade.

- Cooling Tower Manifold Piping Systems / Cooling Tower Distribution Header : Designing and Fabrication of Cooling Tower Manifold Piping Systems / Cooling Tower Distribution Header for Multiple Connections of Cooling Tower, Distribution of Cooling water to Various Locations of Plant for Proper Flow and Even Distribution of Cooling water with Cost Saving for Clients.

- Cooling Tower Piping Connections : Designing and Fabrication of Inlet and Outlet Cooling Tower Connections Piping Layout for Process Equipment’s with Installations of Throttling Valves.

- Cooling Tower Water Fill up : Fabrication of Fill up Pipeline for Cooling Tower for Fill up of water with Installation of Automatic Valve for Automatic Filling of Water in Cooling Towers during Low level of Water in Cooling Tower.

  • ❖ Calculation of Pipe Sizing Based on Velocity and Pressure Drop and Proper Flow.
  • ❖ Calculation of Pipe Wall Thickness as per ASME Standards.
  • ❖ Selection of Manifold Pipe Size for Cooling Towers / Cooling Tower Header Pipe Size.
  • ❖ Selection of Piping Material and its Grades for Pipe, Fittings, Valves as per ASME/ Standards.
  • ❖ Piping Material such as Pipe, Fittings, Valves used for Fabrication of Cooling Tower Piping are of Standard Companies.
  • ❖ Design and Fabrication of Supports for Cooling Tower Piping Systems to Support Dead Weight of Pipe, Fittings, Valves, Water to avoid Sagging of Pipe During Sustain and Operating Conditions and Distance Between the Supports Are Selected as per Piping Engineering Standards.
  • ❖ Piping Material Take off (MTO)/Bill of Material (BOM).
  • ❖ Fabrication of Cooling Tower Piping is Carried out as per General Engineering Standards and Practices.
  • ❖ Pipeline Erection for Cooling Tower.
  • ❖ Checking of Welding Leakages in Piping Weld Joints, Checking of Leakages in Flange Joints and Checking of Leakages in Threaded Connection.
  • ❖ Commissioning of Cooling Tower Piping.