❖ Chilled Water Piping Layout Includes :
- Chilled Water Distribution System : Designing of Piping Layout for Chilled Water distribution system for Whole Plant with Proper Distribution and Flow of Chilled Water to Various Locations of Plant, Fabrication of Chilled Water Distribution System.

- Chilled Water Closed Loop Piping : Designing and Fabrication of Chilled Water Closed Loop Piping System with Installation of a Throttle Valve at the End of Piping for Throttling of Chilled Water for Proper Flow of Chilled Water in Piping System.

- Chilled Water Circulation Pump Piping : Fabrication of Frame for Circulation Pump, Designing of Chilled Water Circulation Pump Piping Layout while Considering Important Aspects for Pump Piping to Avoid Pump Cavitation and Better Fluid Flow, Designing and Fabrication of Circulation Pump Suction Piping, Designing and Fabrication of Circulation Pump Discharge Pipeline, Designing of Piping Layout for Multiple Circulation Pump Connections, Installation of Strainers, Throttle Valves, Non Return Valves (NRV) with Proper Selection of their Materials and Grade.

- Chilled Water Manifold Piping Systems / Chilled Water Header : Designing and Fabrication of Chilled Water Manifold Piping Systems / Chilled Water Header for Multiple Connections of Chilling Plant, Distribution of Chilled Water to Various Locations of Plant for Proper Flow and Even Distribution of Chilled Water with Cost Saving for Clients.

- Chilled Water Piping Connections : Designing and Fabrication of Inlet and Outlet Chilled Water Piping Connections Piping Layout for Process Equipment’s with Installations of Throttling Valves.

- Chilling Plant Water Fill up : Fabrication of Fill up Pipeline for Chilling Plant for Fill up of water with Installation of Automatic Valve for Automatic Filling of Water in Chilling Plants during Low level of Water in Chilling Plant.

  • ❖ Calculation of Pipe Sizing Based on Velocity and Pressure Drop and Proper Flow.
  • ❖ Calculation of Pipe Wall Thickness as per ASME Standards.
  • ❖ Selection of Chilled Water Manifold Pipe Size for Chilling Plants / Chilled Water Header Pipe Size for Chilling Plant.
  • ❖ Selection of Piping Material and its Grades for Pipe, Fittings, Valves as per ASME/ Standards.
  • ❖ Piping Material such as Pipe, Fittings, Valves used for Fabrication of Chilling Plant Piping are of Standard Companies.
  • ❖ Design and Fabrication of Supports for Chilled Water Piping Systems to Support Dead Weight of Pipe, Fittings, Valves, Water Weight to avoid Sagging of Pipe During Sustain and Contracting Conditions, the Distance Between the Supports Are Selected as per Piping Engineering Standards.
  • ❖ Piping Material Take off (MTO)/Bill of Material (BOM).
  • ❖ Fabrication of Chilling Plant Piping is Carried out as per General Engineering Standards and Practices.
  • ❖ Pipeline Erection for Chilling Plant.
  • ❖ Hydraulic and Pneumatic Testing of Chilling Plant Piping for Leak Test Chilling Plant Pipeline, Checking of Welding Leakages in Piping Weld Joints, Checking of Leakages in Flange Joints and Checking of Leakages in Threaded Connection.
  • ❖ Commissioning of Chilling Plant Piping.
  • ❖ Cold Insulations for Chilling Plant Piping with Proper Thickness of Insulation.